Chinh (lelouvincx) / Weekly Planning - 2026-W21

Created Mon, 25 May 2026 00:00:00 +0000 Modified Mon, 25 May 2026 06:02:25 +0000
1214 Words

Plan for week W21 (May 18 – May 24, 2026)

  • Progress vs plan (as of Tue May 19)
    • DONE:
      • Power BI playbook — published to docs (conceptual-differences, migrating-to-holistics). POC end-to-end migration via Claude Code + custom skill.
      • BuyCo onboarding call (Tue May 19) — closed. Tech onboarding checklist in Notion. Hide-confidential-data POC kicked off.
      • Basata onboarding call 4 — closed.
      • Enhance Fitness call watched + RFP assessed.
      • Cross-metric calculation doc review (carry-back, #P2).
    • IN PROGRESS / WAITING:
      • migrate-power-bi AI skill PR (holistics/skills#10) — awaiting anh Khai review.
      • BuyCo SLA / response-time data pull (new TODO from call) — P1, scheduled Thu.
    • NOT STARTED:
      • DAT-576 MRR exchange rate — escalation Wed 1-on-1 (as planned).
      • DAT-524 Zoho test accounts — escalation Wed 1-on-1.
      • Local-dev demo video (Docs P1) — Thu.
      • Auto-export PNG feedback to Khai To — Thu.
      • Wamly check — Wed.
      • H1 self-reflection + CV — locked Sat/Sun.
      • Soạn roadmap Spark cho Yên — Sat AM.
      • Lead Funnel retro — Fri.
    • NEW (added mid-week):
      • TODO Discuss narrative demo for Power BI migration (Slack) — P2, Wed.
      • TODO Write 1-on-1 report — P1, Wed (paired with 1-on-1).
      • IDEA Support other coding agents for logseq automation ([[Logseq]]).
      • NOTE Identity Resolution TOGA case — captured under [Internal] Identity Resolution.

Big W20 wins: CircleCI PR review marathon closed (3-week carry-over cleared); BuyCo theme rolled out; Khai To’s 2-way sync CLI shipped → local-dev demo video unblocked (was 5-week WAITING). Big risk W21: BuyCo onboarding call Tue May 19 — Power BI playbook must be review-ready Mon EOD. Bigger risk: DAT-576 MRR exchange rate now 5-week carry-over — stop scheduling, start escalating. 1-on-1 has two backlog drops to make (DAT-576 re-scope, DAT-524 formal drop). H1 self-reflection + CV 2-week slipped — lock the weekend.

  • P1 – Must Do
    • Presales
      • BuyCo onboarding call (Tue May 19, customer [[BuyCo]]) — Power BI playbook review-ready by Mon EOD so anh Khai To + anh Huy can review Mon evening → publish to docs Tue AM → present in call.
        • 3 call goals: (1) PBI → Holistics migration demo (4–7 min video, Claude Code translating), (2) AI strengths (English→AQL, SQL→AQL, dataset modeling), (3) walk through Xairo’s evaluation matrix + close “Hide confidential data” unknown.
        • Critical demo: row-level permissions (@auth) + column-level masking.
        • Asks to drive: POC extension scope/end-date; 2–3 deep-dive sessions with PMs; written commitment milestone; designer trial access.
        • Refs: Ampcode (call prep), Notion: BuyCo Call Prep.
      • Finish Power BI playbook draft — drafted so far: conceptual-differences.md + migration-overview.md. Pending: dashboard-migration.md, model-migration.md, index.md, optional convert-tmdl-to-aml agent skill. Apply “conceptual diagram > long video” lesson from Tableau→Sigma cortex skill. Refs: Notion: PBI↔Holistics Conceptual Differences, Ampcode.
    • Internal
      • MRR exchange rate (DAT-576) — 5-week carry-over (W16 → W17 → W18 → W19 → W20). Per [[Priority Rules]] 3+ week forcing-function rule: raise in 1-on-1 with anh Triet as a prioritization question, not a scheduling one. Each of the last 5 weeks, presales work legitimately outranked it in customer impact. 3 options ready: (1) re-scope to a presales-compatible size, (2) hand off to someone whose week isn’t presales-loaded, (3) formally de-prioritize until presales calms. Do not commit a “Mon AM block” again — the slot is not the problem.
    • Docs
      • Add demo video for local development docs — WAITING cleared (Khai To 2-way sync CLI shipped May 14). Step 1: update documentation (Ampcode). Step 2: draft scenario + record demo. Aim: 1 doc PR by Fri May 22.
    • Teaching
      • Soạn roadmap Spark cho Yên ([[Teaching]]) — new, captured May 17. Block Sat morning.
  • P2 – Should Do
    • Personal
      • H1 self-reflection draft + CV refresh for 2026 H1 performance review. 2-week slip already — lock Sat May 23 + Sun May 24 non-negotiable, no Smartclass / VCT compromise. PR cycle approaching.
    • Presales
      • Learn Descript (learn.descript.com, [[Presales]]) — for demo-video production. Pairs with the local-dev demo video deliverable.
      • Wamly onboarding — still WAITING on Chukwudi re-engagement (3-week carry-over from W18). If no movement by Wed, move to formal backlog with reason.
    • Internal
      • Continue Cross-Model Calculation (DAT-504, Backlog) — re-evaluate timing after MRR escalation outcome.
      • Upgrade dbt-core of repo dbt to match prefect.
      • Lead Funnel by Sales Motion wrap-up ([[Lead Funnel by Sales Motion]]) — write project retro doc. All DAT-560–564 closed; only retro pending.
    • Docs
      • Send the auto-export dashboard PNG feedback to Khai To (currently draft in Backlog). 2-way sync CLI shipped → right window. Pair with local-dev demo doc PR.
  • P3 – Nice to Have
    • Personal
      • Migrate other notes from Obsidian (in-progress).
      • Review and update [[Personal Context]].
    • Teaching
      • Set-based vs row-based thinking exploration; visualization resources research; pudding.cool resources.
    • Internal
      • TODO Feedback - Publish for CLI? (captured May 18).
  • Backlog (deprioritized — do not pull unless P1/P2 slate clear)
    • Internal — DAT-524 Fix excluding internal Zoho test accounts — 14-week carry-over. Action this week: raise in 1-on-1 (same slot as DAT-576) to formally drop or assign owner.
  • Focus days suggestion (weekend-included)
    • Mon (May 18): Power BI playbook finalization (AM deep work, 09:00–12:00). PM: send draft to anh Khai To + anh Huy for review.
    • Tue (May 19): Publish playbook to docs AM. BuyCo onboarding call (per call time). PM: capture call follow-ups + recovery.
    • Wed (May 20): 1-on-1 with manager — raise DAT-576 re-scope (3 options ready) + DAT-524 formal drop. Local-dev demo doc PR drafting. Lead Funnel by Sales Motion retro.
    • Thu (May 21): Local-dev demo record demo scenario. Send auto-export PNG feedback to Khai To. Wamly check.
    • Fri (May 22): Lead Funnel retro doc. Wrap-up + W21 weekly report. P3 plugin if time.
    • Sat (May 23): AM — Spark roadmap for Yên. PM — H1 self-reflection draft.
    • Sun (May 24): CV refresh + finalize H1 reflection.
  • Carry-over watch
    • ItemSinceWeeksAction
      DAT-576 MRR exchange rateW16 (Apr 13)5Escalate in 1-on-1 Wed as a prioritization question — presales has legitimately outranked it 5 weeks in a row. 3 options: re-scope to presales-compatible size / hand off / de-prioritize. No more Mon AM blocks.
      DAT-524 exclude internal Zoho accountsW7 (Feb 9)14Raise in 1-on-1 Wed to formally drop or assign owner. Same slot as DAT-576.
      Add demo video for local dev docsW17 (Apr 20)5UNBLOCKED — ship 1 doc PR by Fri.
      Wamly onboardingW18 (Apr 27)3Customer-side block. Check Chukwudi re-engagement by Wed; if no movement → backlog.
      H1 self-reflection + CVW19 (May 4)2Lock Sat May 23 + Sun May 24 non-negotiable.
      Power BI playbookW20 (May 15)1Mon EOD review-ready.
  • Principles to apply this week
    • Mon-AM strategic block defense — Power BI playbook deserves the AM block, not carry-overs. Carry-overs go PM or Friday.
    • Prioritization > scheduling — when an item slips 5 weeks straight, it’s not a Monday problem; it’s that other work is genuinely more important. Make the prioritization explicit upward, don’t quietly re-baseline.
    • Conceptual diagram > long video (BuyCo lesson) — applies to playbook AND to demo-video scoping. Diagrams first, narration second.
    • The Mom Test on the BuyCo call — ask about specifics (“which PBI workflow takes longest today?”), avoid leading questions on pain points.
    • Defend weekend deep-work slots like meetings — H1 reflection has slipped twice. Calendar block, treat as immovable.
    • Let demand pull the template — Power BI playbook structure is reusable, but don’t formalize a “BI migration playbook series” until a second migration request lands. Premature formalization = wasted ROI.