Chinh (lelouvincx) / Weekly Planning - 2026-W20

Created Mon, 25 May 2026 00:00:00 +0000 Modified Mon, 25 May 2026 06:02:25 +0000
764 Words

Plan for week W20 (May 11 – May 17, 2026)

Big W19 wins: DAT-560 Lead Funnel by Sales Motion (5-week carry-over) + DAT-555 follow-up both closed. Big risk W20: DAT-576 MRR exchange rate now 4-week carry-over — Hieu left, treat as restart. Mon = context recovery, not implementation. Showbie synthesis owed. Wamly back mid-week (Chukwudi ~May 11–15). [[Basata]] onboarding call 4 Tue May 19 (W21 — prep Fri).

  • P1 – Must Do
    • Internal
      • MRR exchange rate restart (DAT-576) — 4-week carry-over, manager priority. Treat as restart — Hieu left, implementation context lost. Mon AM = context recovery pass (re-read [[[Internal] Customers’ MRR (Exchange Rate)]], DAT-177, Notion docs; trace fct_daily_mrr.exchange_rate_to_sgd upstream in dbt). Mon PM = 30-min sync w/ anh Triet (recover his earlier experiment, decide rate source, decide backfill stance). Tue = draft dim_exchange_rates schema + ECB approach in Linear (no code). Wed = POC ingest if scoping signed off. Escalate to anh Triet by Wed EOD if blocked.
      • Close out CircleCI dbt PR #858 review for anh Dong — IN-PROGRESS, awaiting next review request (Ampcode). Respond same-day.
    • Presales
      • Showbie loss synthesis + chase Harsha for personal feedback — slipped from W19 Wed. Block 2h Wed AM. Output: 1-page Holistics-vs-Omni learning note (focus on Looker-migration moat + security risk perception) + outreach to Harsha. Apply The Mom Test questioning style.
      • Bicycle Transit follow-through — relay Microsoft Fabric DW question to anh Huy Vu (modeling). Confirm SSH algo (RSA only, no Ed25519) for Azure DevOps catch.
    • Docs
      • Add demo video for local development docs — P1 in [[Backlog]]. Still WAITING on Khai To’s 2-way sync CLI; do scenario draft + discuss with anh Huy Vu/Dat. Set scoping by Wed.
  • P2 – Should Do
    • Personal
      • H1 self-reflection draft + CV refresh for 2026 H1 performance review — block Sat May 16 + Sun May 17 for deep work (slid from W19 weekend due to DAT-560 push).
    • Internal
      • DAT-499 — Increase impersonation-lookup data freshness. Manager-elevated context.
      • Continue Cross-Model Calculation (DAT-504, [[Backlog]]). Re-evaluate timing post-DAT-576 kickoff.
      • Upgrade dbt-core of repo dbt to match prefect.
    • Presales
      • Wamly onboarding call — re-pick around May 11–15 per the reschedule thread. When Chukwudi reaches out, schedule + send trial-extension request (Farren’s trial expired May 6).
      • Prep for [[Basata]] onboarding call 4 (Tue May 19) — sync with Taha on dual-dashboard plan + dark-mode follow-up. Block 2h Fri.
    • Docs
      • Send the auto-export dashboard PNG feedback to Khai To (currently draft in [[Backlog]]). Send once 2-way sync CLI ships, otherwise polish + hold.
  • P3 – Nice to Have
    • Personal
      • Auto-format execute_aql JSON → markdown amp plugin — queued IDEA from W19 (Ampcode). 1-day timebox.
      • Daily Slack ingest cronjob POC — see W19 IDEA. Use slack-cli activity. Read-only first, no transform.
      • Migrate journal notes from Obsidian (in-progress).
    • Teaching
      • Set-based vs row-based thinking exploration; visualization resources research.
  • Backlog (deprioritized, do not pull unless P1/P2 slate is clear)
    • Internal: DAT-524 Fix excluding internal Zoho test accounts — 13-week carry-over. Action this week: raise in next 1-on-1 to formally drop or assign owner.
  • Focus days suggestion
    • Mon (May 11): MRR context recovery (09:00–12:00 hard block) — re-read MRR knowledge page + DAT-177 + Notion docs; trace fct_daily_mrr.exchange_rate_to_sgd upstream. PM: 30-min sync w/ anh Triet on rate source + backfill. BuyCo daily sweep.
    • Tue (May 12): MRR — draft dim_exchange_rates schema + ECB approach in Linear comment, tag Sriram + Vincent. Bicycle Transit follow-through (Fabric DW Q to anh Huy Vu, SSH algo confirm). Address CircleCI dbt #858 if review lands.
    • Wed (May 13): MRR POC (1-month ECB ingest) if scoping signed off OR escalate to anh Triet. Showbie synthesis (2h AM). DAT-499 design pass.
    • Thu (May 14): DAT-504 re-evaluation. Demo video scenario draft (Docs). 1-on-1 — raise DAT-524 backlog drop.
    • Fri (May 15): [[Basata]] call 4 prep (2h). Wrap-up + W20 weekly report. Auto-format AQL plugin (P3) if time.
    • Sat–Sun (May 16–17): H1 self-reflection draft + CV refresh for 2026 H1 performance review. Skip Smartclass commits.
  • Carry-over watch
    • ItemSinceWeeksAction
      DAT-576 MRR exchange rateW16 (Apr 13)4Restart — Hieu left, context lost. Mon AM = recovery pass. Wed EOD = decision point: POC or escalate to anh Triet.
      CircleCI dbt PR #858 reviewW18 (Apr 27)2IN-PROGRESS — respond same-day to next review request.
      Wamly onboardingW18 (Apr 27)2Customer-side block (paternal leave). Re-pick May 11–15.
      Add demo video for local dev docsW17 (Apr 20)3Scenario draft this week regardless of CLI ship.
      DAT-524 exclude internal Zoho accountsW7 (Feb 9)13Raise in 1-on-1 to formally drop or reassign.
      Showbie loss synthesisW19 (May 4)1Block Wed AM.